Hi: We have moved from SAP 8.8 to SAP 9.0 and we have seen a change in the way that the MRP works Scenario: Need to make for May 5, 100 Widgets parts that use 100 Gadgets. Lets say that originally that the Gadgets were supposed to arrive on May 1, but somehow they get pushed to May 10. The work order has not been created. Behavior with 8.81: The MRP signals that we are going to need 100 Gadgets (RED ON GADGETS) on May 1, no matter that we have already an order that will arrive on May 10. GOOD Behavior with 9.0: The MRP tel us to make 100 widgets on May 10th . Come on the customer needs that on May 1. BAD I want my old behavior back. Is it possible? Regards Miguel
↧