Hi,
Another thing if it is not 03 inspection lot,
You are using QS61 (material specification) for the inspection, but you have also maintained the MICs in the inspection plan. That raises a doubt !!
What have you maintained in the material master for this inspection type? Is it inspection wrt Task list or Mat specification??
I believe you had tried activating 'Mat specification' there for your initial requirement. But you didn't maintain the link with a Class characteristic (which is required when you assign a MICs in QS61).
Then you would have maintained it in Inspection plan (but in material master, Mat spec is activated)
Please confirm what exactly is happening in this case. Is it 03? Or some other issue??
Pl check all these and if possible, share screens.
ntn