Per my case rep:
I heard back from engineering and they have confirmed that CR has been fixed and is estimated for PD 16.5.2 EBF 2.
Hope it is out in time to help everyone.
James.
Per my case rep:
I heard back from engineering and they have confirmed that CR has been fixed and is estimated for PD 16.5.2 EBF 2.
Hope it is out in time to help everyone.
James.